Case Study: Stateline Shipping and Transport Company
Requirement
1. In Excel, or other suitable program, develop a model for shipping the waste directly from the 6 plants to the 3 waste disposal sites.
2. Solve the model you developed in #1 (above) and clearly describe the results.
3. In Excel, or other suitable program, Develop a transshipment model in which each of the plants and disposal sites can be used as intermediate points.
4. Solve the model you developed in #3 (above) and clearly describe the results.
5. Interpret the results and draw conclusions that address the question posed in the case problem. What are the limits of the study? Write at least one paragraph.