I am a final year civil and structural student and i need your help about my final year project.
My Final Year Topic:
Finite Element Analysis of a bridge using Sap2000
Aim:
Finite element analysis using Sap 2000.
Objectives:
1- Model the bridge.
2- Subject to certain loading. (dead and live;wind and earthquake, vehicles and pedestrians)
3- Finalize the results.
Provisional Table of Contents
Acknowledgements.
Abstract.
Introduction.
Literature Review.
Cable-stayed bridge.
How to Build a Bridge Model in Sap2000 V14.2
Building the Bridge Model in Sap2000 v14.2
Analysis of the Bridge Model.
Conclusion.
References.
I would like to build The Clark Bridge which is a cable-stayed bridge across the Mississippi River between West Alton, Missouri and Alton, Illinois.