Question: One of your team members, Isaak, is responsible for quality control checks of the prototype. The first test went well, but the next test showed failures in one of the systems. Isaak has reported the findings to you and seems to be constantly thinking about the failure of the test. Instead of moving on to the next testing level, he is spending time telling his team about the failure. The team went out for an evening bonding event at the local bowling ally but all Isaak could talk about was the failed test results. How would you describe Isaak's behavior Group of answer choices Building morale by relaying the failure story Attempting to lighten up the situation with appropriate humor engaged in hot button thinking Dwelling on the failure