How would you assess p-two-ps effort at introducing scrum


Case Study Assignment

Instructions

Read "Introducing Scrum at P2P- Part A and Part B".

After reading Part A of the case, answer the following questions based on the case details.

I. How well is Scrum working?
II. What are the issues confronting the Big Foot project?
III. Assume you are Kendra. What would you want to say at the retrospective? How would you say it?
IV. What improvements or changes need to be made?

After reading Part B of the case, answer the following questions based on the case details.

I. How would you assess P2P's effort at introducing Scrum?
II. What challenges does an organization face when adopting an agile approach like Scrum?
III. What could P2P have done to enhance success?
IV. Identify the core agile project management principles P2P used in managing this project. How would the project have been handled differently if traditional project management principles had been utilized instead?

Reread pages 17-18 in Chapter 1 or your textbook, and answer the following questions about this case.

I. What would be the technical side and the sociocultural side of this project?
II. How can a Scrum master be in charge of both the technical side and sociocultural side of this project?

Format your assignment according to the give formatting requirements:

a. The answer must be double spaced, typed, using Times New Roman font (size 12), with one-inch margins on all sides.

b. The response also includes a cover page containing the title of the assignment, the course title, the student's name, and the date. The cover page is not included in the required page length.

c. Also include a reference page. The references and Citations should follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Project Management: How would you assess p-two-ps effort at introducing scrum
Reference No:- TGS03028815

Now Priced at $35 (50% Discount)

Recommended (93%)

Rated (4.5/5)