A manager walked by two supposedly equivalent assembly lines and took a sample of size three from each one. He noted that the three from one line were shorter than the three from the other line and immediately stated: "I am 90% confident that these two lines are not producing the same product and that they need to be shut down and adjusted." How can he say this with such a small sample size?