How successful was the project within the triple constraint


Assignment: PROJECT CLOSEOUT/LESSONS LEARNED INSTRUCTIONS

Length: 3 to 5 pages.

Using the same project presented in the charter/proposal assignment in this deliverable, provide a summary of your project completion (or current status if not complete). This summary should answer the following questions:

1. Was the project successful? Why or why not? How do you know?

2. How successful was the project within the "triple constraint"?

3. Address benefits realization management-what business value did your project deliver? How/when will you know if this value was really delivered?

4. Compare project performance to the cost, schedule, scope and quality baselines included in the PMP assignment.

5. Lessons learned-what can others managing a similar project in the future take from this project to make it easier/better next time?

Format your assignment according to the following formatting requirements:

o The answer should be typed, using Times New Roman font (size 12), double spaced, with one-inch margins on all sides.

o The response also includes a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

o Also include a reference page. The Citations and references must follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Project Management: How successful was the project within the triple constraint
Reference No:- TGS03044786

Now Priced at $55 (50% Discount)

Recommended (94%)

Rated (4.6/5)