1. Relative to gage capability studies, explain the different uses and interpretations between "Gage R&R as a percent to engineering tolerance" versus "gage R&R as a percent to study variation"
2. Why specific terminology and symbols should be used when producing Value Stream mapping (lean thinking) or any other process improvement visual tool?
3. How should airline deal with customer of size from a safety perspective