A man lifts a bucket of concrete of 20.0 kg from the ground up to the top of a tall building of 30.0 m. The bucket is primarily at rest, however is traveling at 4.0 m/s if it reaches the top of the building. Determine how much work was done by the man in lifting the bucket?