How much work is done if force is done but parallel to snow


A person pulls a toboggan for a distance of 20.0 m along the snow with a rope directed 30.0° above the snow. The tension in the rope is 90.0 N. How much work is done on the tobaggan by the tension force and how much work is done if the same force is done but parallel to the snow?

Request for Solution File

Ask an Expert for Answer!!
Physics: How much work is done if force is done but parallel to snow
Reference No:- TGS0147607

Expected delivery within 24 Hours