How much overhead cost is allocated to the supervising


SOllivier Corporation has an activity-based costing system with three activity cost pools-Processing, Supervising, and Other. In the first stage allocations, costs in the two overhead accounts, equipment expense and indirect labor, are allocated to the three activity cost pools based on resource consumption. Data used in the first stage allocations follow:

Overhead costs:

Equipment expense ...... $33,000
Indirect labor ......... $5,000

304_68-B-M-A-A-B-C (824)-1.png

Processing costs are assigned to products using machine-hours (MHs) and Supervising costs are assigned to products using the number of batches. The costs in the other activity cost pool are not assigned to products. Activity data for the company's two products follow:

777_68-B-M-A-A-B-C (824)-2.png

How much overhead cost is allocated to the Supervising activity cost pool under activity-based costing?
A) $13,200 B) $14,700 C) $8,100 D) $1,500 

Solution Preview :

Prepared by a verified Expert
Managerial Accounting: How much overhead cost is allocated to the supervising
Reference No:- TGS01250826

Now Priced at $15 (50% Discount)

Recommended (94%)

Rated (4.6/5)