How many supply-side constraints are needed


Problem: A large book publisher has five manuscripts that must be edited as soon as possible. Five editors are available for doing the work, however their working times on the various manuscripts will differ based on their backgrounds and interests. The publisher wants to use an assignment method to determine who does what manuscript. Estimates of editing times (in hours) for each manuscript by each editor is:

                                    Editor

Manuscript       A         B          C          D         E

1                      12        8          10        16        13

2                      9          10        14        13        9

3                      17        14        9          18        12

4                      15        7          11        9          18

5                      12        18        22        11        27

a) How many supply-side constraints are needed?

b) How many demand-side constraints are needed?

c) How many variables are involved in this assignment method?

Solution Preview :

Prepared by a verified Expert
Operation Research: How many supply-side constraints are needed
Reference No:- TGS02013575

Now Priced at $20 (50% Discount)

Recommended (93%)

Rated (4.5/5)