Problem
An embankment is to be constructed at a 12% moisture content. Material will be placed at the rate of 270 ccy/hr. The specified dry weight of the compacted fill is 2,900 lb/cy. How many gallons of water must be supplied each hour to increase the moisture content of the material from 7 to 12% by weight?
The response should include a reference list. Double-space, using Times New Roman 12 pnt font, one-inch margins, and APA style of writing and citations.