A survey is being planned to determine the mean amount of time corporation executives watch television. A pilot survey indicated that the mean time per week is 15 hours, with a standard deviation of 3.5 hours. It is desired to estimate the mean viewing time within one-quarter hour. The 98 percent level of confidence is to be used.
How many executives should be surveyed?