How long is the project expected to take


1. Develop a network drawing for Hill Construction and determine the critical path. How long is the project expected to take?

2. What is the probability of finishing in 270 days?

3. If it were necessary to crash to 250 or 240 days,how would Hill do so, and at what costs? As noted in the case, assume that optimistic time estimates can be used as crash times

Request for Solution File

Ask an Expert for Answer!!
Operation Management: How long is the project expected to take
Reference No:- TGS085575