How kpis can tied to strategic vision and project planning


Assignment: Key Performance Indicators

1. Consider the importance of Key Performance Indicators (KPIs) as an IT manager. The previous measurement period has concluded, and you must prepare an update to the CIO on your IT team. Some KPIs are pre-determined. You must also recommend other KPIs for your team.

Prepare a 14- to 16-slide media-rich or voice-over presentation. Include the following:

o Review the provided Key Performance Indicators (KPIs).

o Add at least three additional KPIs.

o Research IT performance tools for monitoring and evaluation of the KPIs. Include how each tool effectively meets assurance practices and IT performance.

o Discuss how KPIs can be tied to strategic vision and project planning.

Format your assignment according to the following formatting requirements:

1. The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

2. The response also includes a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

3. Also include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Management Information Sys: How kpis can tied to strategic vision and project planning
Reference No:- TGS03021286

Now Priced at $45 (50% Discount)

Recommended (94%)

Rated (4.6/5)