How it is implemented from more of a purists approach and


Assignment Overview

In this module, we are going to look at the BSC from more of an adaptive approach. That is to say, how adaptable is this tool given the wide variety of organizations out there in the world.

In this assignment you are asked to study the required readings and to read the following case study:

Basu, R., Little, C., Millard, C., (2009). Case Study: A fresh approach of the Balanced Scorecard in the Heathrow Terminal 5 project. Measuring Business Excellence. 13(4). 22-33. Retrieved from: https://www.perf-ex.co.uk/wp-content/uploads/2012/04/T5-case-study-MBE-papaer.pdf

After reading this article, write an essay in which you compare and contrast the balanced scorecard utilized by the British Airport Authority (BAA) at Heathrow Airport's Terminal 5 project with the standard quadrants typically applied in a traditional BSC approach (financial focus, Internal focus, Learning and Growth focus, and Customer focus). That is to say, the Terminal 5 project was a large, public construction project using private contractors.

Yet, the BSC approach is also applied to the manufacturing sector, health care sector, and is applied in both private and public organizations. So you'll want to consider how the T5 project adapted the BSC approach to fit the prevailing circumstances to help formulate your arguments.

Solution Preview :

Prepared by a verified Expert
Project Management: How it is implemented from more of a purists approach and
Reference No:- TGS01150724

Now Priced at $40 (50% Discount)

Recommended (92%)

Rated (4.4/5)

A

Anonymous user

5/19/2016 7:51:48 AM

In this task you are asked to study the requisite readings and to read the given case study titled: Basu, R., Little, C., Millard, C., (2009). Case Study - A fresh approach of the Balanced Scorecard in the Heathrow Terminal After considering the article, write down an essay in which you differetiate the balanced scorecard used by the British Airport Authority (BAA) at Heathrow Airport's Terminal 5 project by means of the standard quadrants generally applied in a traditional BSC approach. That is to state, the Terminal 5 project was a large, public construction project employing private contractors. Yet, the BSC approach is as well implemented to the manufacturing sector, health care sector, and is implemented in both private and public organizations. So you will wish for to consider how the T5 project adapted the BSC approach to fit the prevailing conditions to assist formulating your arguments.