Corp A makes model boats, and it is switching to a lean manufacturing process. At one assembly area, Corp A is using one part container that holds 250 parts, and it wants the output to be approximately 150 finished parts per hour. Corp A also desires a 10% safety stock for this part. How fast will the container have to make through the system to accomplish this?