As part of its initiative to implement just-in-time (JIT) manufacturing at the motorcycle assembly plant. Harley has reduced the number of engines loaded on each truck to 100. If each truck trip still cost $1,000, how does the decision impact annual inventory costs at Harley? What should the cost of each truck be if a load of 100 engines is to be optimal for Harley?