Assignment:
Suppose that the expected variable costs of Otobai's project are ¥33 billion a year and that fixed costs are zero.
a. How does this change the degree of operating leverage (DOL)?
b. Now recompute the operating leverage assuming that the entire ¥33 billion of costs are fixed.