Problem: How do you calculate throughput time and cycle time in a production process based on the following process flow?
Operation A is 240 units/hr
Operation B is 180 units/hr
Operation C is 200 units/hr
These operations are followed by Work in Process Storage
And the final Operation D is 300 units/hr