The following data have been recorded for recently completed Job 674 on its job cost sheet. Direct materials cost was $1,639. A total of 28 direct labor-hours and 171 machine-hours were worked on the job. The direct labor wage rate is $13 per labor-hour. The company applies manufacturing overhead on the basis of machine-hours. The predetermined overhead rate is $14 per machine-hour. The total cost for the job on its job cost sheet would be?