Question: 1. How can a contractor verify that the desired alignment and depth are being maintained while performing horizontal earth boring?
2. Estimate the time required to load 400 cu yd (306 ni3) of gravel into trucks using a clamshell having a heaped bucket capacity of 1 cu yd (0.75 m3). Estimated cycle time is 25s. Job efficiency is estimated to be 80%.