Gino Petralli is an enterprising businessman. He is in the process of starting up a pizzeria. Specifically, he needs to know if 10 tables in his dining area is enough. Further, he would like to ensure the average time a party must wait for a table is less than 2 minutes. Do a manual simulation of Gino's Pizzeria to determine if the facility can meet Gino's criteria with its current setup
Assume there are 10 tables in the pizzeria and at the beginning of the simulation, 8 of the tables are occupied. The first table below shows the departure times of each group that is already in the pizzeria. The process generators for this problem are also shown below.