Because of excessive pollution on the Momiss River, thestate of Momiss is going to build pollution control stations.Three sites (1, 2, and 3) are under consideration. Momiss isinterested in controlling the pollution levels of two pollutants(1 and 2). The state legislature requires that at least 80,000tons of pollutant 1 and at least 50,000 tons of pollutant 2 beremoved from the river. The relevant data for this problemare shown in Table 10. Formulate an IP to minimize the costof meeting the state legislature's goals.