A company manufactures three products: A, B, and C. Each unit of product A requires 1 hr of engineering service, 10 hr of direct labor, and 3 lb of material. To produce one unit of product B requires 2 hr of engineering, 4 hr of direct labor, and 2 lb of material. Each unit of product C requires 1 hr of engineering, 5 hr of direct labor, and 1 lb of material. There are 100 hr of engineering, 700 hr of labor, and 400 lb of materials available. The cost of production is a nonlinear function of the quantity produced as shown below:
![1104_d1f42c84-cf9b-4c7b-abe5-1b1cbfb3cb91.png](https://secure.tutorsglobe.com/CMSImages/1104_d1f42c84-cf9b-4c7b-abe5-1b1cbfb3cb91.png)
![1878_b8d54e5a-102c-41ce-8274-344b475ddcbe.png](https://secure.tutorsglobe.com/CMSImages/1878_b8d54e5a-102c-41ce-8274-344b475ddcbe.png)
Formulate a mixed-integer program to determine the minimum-cost production schedule.