Formulate a linear programming model for this problem and


A company produces two products that are processes on two assembly lines. Assembly line 1 has 100 available hours, and assembly line 2 has 42 available hours. Each product requires 10 hours of processing time online 1, while on line 2 product 1 requires 7 hours and product 2 requires 3 hours. The profit for product 1 is $6 per unit, and the profit for product 2 is $4 per unit.

a. Formulate a linear programming model for this problem.
b. Solve this model by using graphical analysis.

Solution Preview :

Prepared by a verified Expert
Business Management: Formulate a linear programming model for this problem and
Reference No:- TGS0939001