Formulate a balanced transportation problem that can be


Assignment

1. Consider the project outlined in the table below.

Activity

Immediate Predecessor

Present Duration

Accelerated Duration

Present Cost

Accelerated Cost

A

-

10

9

11

15

B

-

15

13

20

25

C

A

10

6

9

20

D

A

20

18

25

30

E

C

15

10

20

35

F

B

17

15

20

30

G

B

12

10

15

25

H

D, F

9

8

12

18

I

G, H

7

6

10

15

a. Construct an activity network diagram

b. Disregarding the acceleration information, how long is the project expected to take to complete?

c. If the project duration was to be reduced by at least one unit of time what activity (or activities) would you crash?

d. Detail the steps you would take to crash the project to its minimum duration at the lowest cost

2. A mobile phone company services six geographical areas. The satellite distances in thousands of miles are given in the figure below. The company needs to determine the best quality message routes that should be established between each two areas in the network. Explain whether the company is facing shortest path problem or not.

2425_Supply Routes Network.png

3. School of Mathematical and Physical Sciences has three professors who each teach four courses per year. Each year, four sections of Algebra, OR, and Modelling must be offered. At least one section of each class must be offered during each semester (Semester 1 and 2). Each professor's time preference and preference for teaching various courses are given in the following table.

 

Professor 1

Professor 2

Professor 3

Semester 1 Preference

3

5

4

Semester 2 Preference

4

3

4

Algebra

6

4

5

OR

5

6

4

Modelling

4

5

6

The total satisfaction a professor earns teaching a class is the sum of the semester satisfaction. Thus, professor 1 derives a sati fiction of 3 + 6 =9 from teaching algebra during semester 1. Formulate an MCNFP that can be used to assign professors to courses so as to maximize the total satisfaction f the three professors.

4. During the next two months, Machineco must meet (on time) the demands for three types of products shown in the Table 1. Two machines are available to produce these products. Machine 1 can only produce products 1 and 2, and machine 2 can only produce products 2 and 3. Each machine can be used for up to 40 hours per month. Table 2 shows the time required to produce one unit of each product (independent of the type of machine); the cost of producing one unit of each product on each type of machine; and the cost of holding one unit of reach product in inventory for one month. Formulate an MCNFP that could be used to minimize the total cost for meeting all demands on time.

Table 1

Month

Product 1

Product 2

Product 3

1

50 units

70 units

80 units

2

60 units

90 units

120 units

Table 2

 

Product

Production   Time (minutes)

Production costs ($)

Holding costs ($)

Machine 1

Machine 2

1

30

40

-

15

2

20

45

60

10

3

15

-

55

5

5. Televco produces TV picture tubes at three plants. Plant 1 can produce 50 tubes per week; plant 2, 100 tubes per week; and plant 3, 50 tubes per week. Tubes are shipped to three customers. The profit earned per tube depends on the site where the tube was produced and on the customer who purchases the tube based on the following table. Customer 1 is willing to purchase as many as 80 tubes per week; customer 2, as many as 90; and customer 3, as many as 100. Televco wants to find a shipping and production plan that will maximize the profits.

a. Formulate a balanced transportation problem that can be used to maximize Televco's profit.

b. Use the northwest corner method to find a bfs to the problem.

c. Use the transportation simplex to find an optimal to the problem.

d. Formulate the problem as a linear programming problem and solve them via Software. Compare the Software solution with your finding in (c).

From

To

Customer 1

Customer 2

Customer 3

Plant 1

75

60

69

Plant 2

79

73

68

Plant 3

85

76

70

Solution Preview :

Prepared by a verified Expert
Supply Chain Management: Formulate a balanced transportation problem that can be
Reference No:- TGS01158559

Now Priced at $60 (50% Discount)

Recommended (97%)

Rated (4.9/5)

A

Anonymous user

5/5/2016 2:52:26 AM

For the following supply chain management problem; provide solution to each part by solving and showing the computation part. Q1. Consider the project outlined by using the table illustrated in the problem. a) Draw an activity network diagram. b) Forgetting about the acceleration information, explain how long is the project anticipated to take to complete? c) If the project period was to be decreased by at a minimum of one unit of time what activity (or activities) would you crash? d) Illustrate the steps you would take to crash the project to its minimum period at lowest cost. Q2. A mobile phone organization services six geographical regions. The satellite distances in thousands of miles are provided in the figure. The company requires finding out the best quality message routes which must be established between each of two regions in the network. Describe whether the organization is facing shortest path problem or not.