For the net present value (NPV) criteria, a project is acceptable if NPV is ________, while for the profitability index a project is acceptable if PI is ________.
a. greater than zero; greater than zero
b. greater than one; greater than one
c. greater than zero; greater than the required return
d. greater than zero; greater than one