For one particular metal cutting operation at Electric Sheep, an analyst has timed an operatorfor 50 cycles. The average time per cycle was 10.40 minutes, and the standard deviation was 1.20 minutes for the worker. Assume a standard time of 10 minutes and an allowance of 20 percent of job time, calculate the performance rating for this worker, in percent.