A 5-m-diameter cylindrical tank is emptied by a constant outflow of . A two-position controller is used to open and close a fill valve with an open flow of 2.0 m2. For level control, the neutral zone is 1 m and the setpoint is 12 m.
a. Calculate the cycling period.
b. Plot the level versus time.