Is it TRUE or FALSE?
1. Using multiple measures of performance to evaluate an employee is one way to hold the employee accountable not only for the result of his/her actions but also for how the result was achieved.
2. Master budgets are based on one level of production while a flexible budget can be prepared for any production level within a relevant range.
3. For fixed manufacturing costs, the difference between the master budget and the flexible budget is equal to zero.