2-For case the study shown in figure below, explain how the consolidation process could be expected due to the consolidation of the clay layer, and estimate the period over which this will take place.

2-Referring,again,to case the study shown in figure below, explain how the consolidation process could be accelerate so that the construction of the road pavement could be carried out after a 6 month period of the embankment being build, if the maximum permitted settlement after the construction of the road pavement was 25 mm . you explanation mus be supported by appropriate calculation.