Floor-On, Ltd., operates a line that produces self-adhesive tiles. This line consists single-machine stations and is balanced. A manufacturing engineer has estimated th bottleneck rate of the line to be 2,400 cases per 16-hour day and the raw process time t be 40 minutes. The line has averaged 1,600 cases per day, and cycle time has averaged hours. How does this performance compare to the practical worst case?