Finding standard time for an operation


Assignment:

An analyst has timed a metal-cutting operation for 50 cycles. The average was 10.40 minutes, and the standard deviation was 1.20 minutes for a worker with a performance rat. ing 125 percent. Assume an allowance of 16 percent of job time. Find the standard time for of this operation.

Your answer must be typed, double-spaced, Times New Roman font (size 12), one-inch margins on all sides, APA format and also include references.

Request for Solution File

Ask an Expert for Answer!!
Operation Management: Finding standard time for an operation
Reference No:- TGS02005578

Expected delivery within 24 Hours