Finding maximum-profit daily production plan


Assignment:

Green Vehicle Inc. manufactures electric cars and small delivery trucks. It has just opened a new factory where the C1 car and the T1 truck can both be manufactured. To make either vehicle, processing in the assembly shop and in the paint shop are required. It takes 1/40 of a day and 1/60 of a day to paint a truck of type T1 and a car of type C1 in the paint shop, respectively. It takes 1/50 of a day to assemble either type of vehicle in the assembly shop. A T1 truck and a C1 car yield profits of $300 and $220, respectively, per vehicle sold. a) Define the objective function and constraint equations. b) Graph the feasible region. c) What is a maximum-profit daily production plan at the new factory? d) How much profit will such a plan yield, assuming whatever is produced is sold.

Provide complete and step by step solution for the question and show calculations and use formulas.

Request for Solution File

Ask an Expert for Answer!!
Supply Chain Management: Finding maximum-profit daily production plan
Reference No:- TGS01954933

Expected delivery within 24 Hours