Solve the following:
Q: People assigned to assemble circuit boards for a computer manufacturing company under go on the job training. From past experience it was found that the learning curve for the average employee is given by:
N=40(1-e^-0.12t) (everything past e is to the power)
where N is the number of boards assembled per day after t days of training. Graph this function for 0 is< with a line under < t < with a line under < 30. What is maximum number of boards an average employee can be expected to produce in 1 day?