A trowel finished concrete rectangle channel is to carry 750cfs of power plant cooling water. The channel is 10ft wide and 300ft long. If the downstream elevation is 100.00, what does the upstream elevation of the channel bottom have to be in order for the water to flow at normal depth of 5.0ft?