Find the total amount of work done in joules when the


A leaky bucket was pulled from the ground up to 8 meters above the ground at a constant rate of 0.5 meters per second. Initially, the bucket contained 25 liters of water. The water was leaking out of the bucket at a constant rate of 0.3 liters per second. Assume that both the bucket and the rope have neglible weight. The acceleration due to gravity is 9.8 m/s2 . The density of water is 1 kilogram per liter.

Find the total amount of work done (in joules) when the bucket of water was moved from the ground to 8 meters above the ground.

Solution Preview :

Prepared by a verified Expert
Electrical Engineering: Find the total amount of work done in joules when the
Reference No:- TGS01422659

Now Priced at $10 (50% Discount)

Recommended (97%)

Rated (4.9/5)