Problem:
A manufacturing process consists of three sequential operations. At maximum capacity operation A can output 125 units per hour, Operation B can output 120 units per hour, and Operation C can output 130 units per hour. There is one worker assigned to each of the three operations.
Required:
Working at the maximum capacity level, what would be the output of this process in an 8 hour work day? Solve the given numerical problem and illustrate step by step calculation.