Find the optimum number of equipments


1) Daily Demand at Plant is 275 MT
Minimum order Qty is 2200 MT
Effective Lead Time is 11 Days

Find the "N" day, which order is to be placed.

2) Equipment Load size is 20 MT.
Plant Loading Capacity is 250 MT/Day.
Total Loading Required is 2200 MT/ "N" Days calculated in (1)

Find the Optimum No. of Equipments to be Placed per day to be Loaded at minimum cost.