Find the optimal peak load toll for crossing bridge


The per-week demand for use of the Golden Gate Bridge in San Francisco is P = 13 - 0.15Q during peak traffic periods and P = 10 - 0.1Q during off-peak hours, where Q is the number of cars crossing the bridge in thousands and P is the toll in dollars. If the marginal congestion cost of using the bridge is MC = 5 + 0.2Q, what is the optimal peak load toll for crossing the bridge?

Select one:

A. 6.5

B. 8.0

C. 8.7

D. 9.9

E. 10.6

Request for Solution File

Ask an Expert for Answer!!
Microeconomics: Find the optimal peak load toll for crossing bridge
Reference No:- TGS0513925

Expected delivery within 24 Hours