A process is to be monitored with standard values m (mu) = 10 and s = 2.5. The sample size is n = 2.
(a) Find the center line and control limits for the X-bar chart.
(b) Find the center line and control limits for the R chart.
(c) Find the center line and control limits for the s chart.