Burrito King (a new fast-food franchise opening up nationwide) has successfully automated burrito production for its drive-up fast-food establishments. The Burro-Master 9000 requires a constant 45 seconds to produce a batch of burritos. It has been estimated that customers will arrive at the drive-up window according to a Poisson distribution at an average of one every 50 seconds. To help determine the amount of space needed for the line at the drive-up window, Burrito King would like to know the expected average time in the system, the average line length (in cars), and the average number of cars in the system.