Figure 4-1 of the Project Management Institute (PMI)® Practice Standard for Work Breakdown Structures (Page 23) shows an annotated version of the WBS for a bicycle. It identifies elements 1.4 (Braking System) and 1.5 (Shifting System) as needing more decomposition.
Your assignment is to add detail to this WBS as follows:
- Add at least three level 3 elements to the braking system (i.e. 1.4.1, 1.4.2, and 1.4.3)
- Add at least three level 3 elements to the shifting system
- Add a new section, 1.8, for the element "Smart Phone Speaker Dock." Make sure it has at least three level 3 elements as well.
- Use any one of the WBS formats described in Appendix D of the Practice Standard for Work Breakdown Structures, including:D.2 Outline View
- Tabular View
- Tree Structure View
- Outline View with Dictionary Elements
- You must submit the complete WBS for this assignment, not just the changes you make.