Question - Factory Overhead is applied at a rate of $9 per hour, of which $6 is variable. The actual variable factory overhead is $32,000. In the current period, 2500 units are produced at a standard time of 2 labor hours per unit. These units require 5,500 actual labor hours. What is the controllable variance?