Assignment
Calleam Consulting Case Study on Denver Int'l Airport Baggage Handling will be used to complete module 6 case study analysis. Refer also to PMBOK Chapters 10, 11, & 12: Risk & Procurement. One of the best ways to learn is to analyze a case, a particular situation that exemplifies the issues, strengths, and weaknesses that are faced when actually managing a project. This is a proven learning tool shown to reinforce knowledge and understanding of material. The case studies focus on two important aspects of project management, aspects that are used to judge the success of projects. The second case is Communications, Risk and Procurement. These are important because a project cannot be managed successfully without effective communications, risk management and mitigation, and timely purchasing of necessary supplies.
Framework:
A. Introduce the case and offer a summary of the issues and the main concerns in the case.
B. Explain how the issues and concerns could impact the success of the project.
C. Drawing from the PMBOK Guide and other course material, and most importantly your knowledge and expertise of project management, critique how the case was handled. What was done right, what went wrong, what could have been done differently, why, and how?
D. Explain what you learned about project management from the case.
Format your assignment according to the give formatting requirements:
• The answer must be using Times New Roman font (size 12), double spaced, typed, with one-inch margins on all sides.
• The response also includes a cover page containing the student's name, the title of the assignment, the course title, and the date. The cover page is not included in the required page length.
• Also include a reference page. The references and Citations should follow APA format. The reference page is not included in the required page length.