SYNCHRONOUS MANAGEMENT - JIT, MPR II, AND ASSEMBLY LINES
1. Explain the River Analogy.
2. Explain the invalid assumptions of traditional batch sizing.
3. Explain the difference between a process batch and a transfer batch.
4. Explain manufacturing resource planning (MRP II) system.