Explain greenville cabinets received a contract


Lineare Programming:

This is an MBA level problem. Please use Excel to solve (do not use Lindo). Please explain each step in the problem.

Problem:
Greenville Cabinets received a contract to produce speaker cabinets for a major speaker manufacturer. The contract calls for the production of 3300 bookshelf speakers and 4100 floor speakers over the next two months, with the following delivery schedule.

Model Month1 Month2
Bookshelf 2100 1200
Floor 1500 2600

Greenville estimates that the production time for each bookshelf model is 0.7 hour and the production time for each floor model is 1 hour. The raw material costs are $10 for each bookshelf model and $12 for each floor model. Labor costs are $22 per hour using regular production time and $33 using overtime. Greenville has up to 2400 hours of regular production time available each month and up to 1000 additional hours of overtime available each month. If production for either cabinet exceeds demand in month 1, the cabinets can be stored at a cost of $5 per cabinet.
For each product, determine the number of units that should be manufactured each month on regular time and on overtime to minimize total production and storage costs.

Request for Solution File

Ask an Expert for Answer!!
Operation Research: Explain greenville cabinets received a contract
Reference No:- TGS024900

Expected delivery within 24 Hours