Examining a pre-stressed concrete cable stayed bridge


Question: Analyze a pre-stressed concrete cable stayed bridge with main span 200 m.

1) It has H- Shape pylons with height of 60m.

2) The main structural system if this bridge is composing of pre- stressed concrete cellular box girder, reinforced concrete tower and high strength steel cables.

3) The 90 cables are made up of high strength standard steel wires and 7mm steel wires.

4) The cables are covered with 5 to 8mm polyethylene sheet for corrosion protection.

5) The typical spacing between the cable anchors is 6m at the bridge deck and 4m at the tower.

6) H-shaped pylons are made up of M60 concrete with cube compressive strength and Fe415 steel material.

7) This bridge has two lanes, totaling 10m in width.

8) The pre-stressed concrete cellular box girder has a 2m wide and 2m deep with a standard section. The pre-stressed concrete box decks are made of M60 concrete.

Is the academic stress becoming intolerable with each and every passing day? Well, if your response is positive, then taking online assistance from Pre-Stressed Concrete Cable Assignment Help is your final destination.

Tags: Pre-Stressed Concrete Cable Assignment Help, Pre-Stressed Concrete Cable Homework Help, Pre-Stressed Concrete Cable Coursework, Pre-Stressed Concrete Cable Solved Assignments

Request for Solution File

Ask an Expert for Answer!!
Other Subject: Examining a pre-stressed concrete cable stayed bridge
Reference No:- TGS03025404

Expected delivery within 24 Hours