Evaluate the process flow chart using the lean concept


Assignment: Statistical Process Control Methods

1) Evaluate the process flow chart using the LEAN concept to find ways to eliminate waste and improve the process.

2) Calculate the defined process metrics including variation and process capability; and develop and display a control chart for the process

3) Write a 700 words executive summary that includes the following:

a) A summary of the Process Evaluation (using either Lean or SPC or Six Sigma)
b) A summary of the Evaluation of Control Chart and Process metrics based on SPC methods
c) A summary of your evaluation of whether the process would benefit from the use of Six Sigma, Lean, or other tools
d) A description of the SPC project and recommendations for improvements

Format your assignment according to the following formatting requirements:

(1) The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

(2) The response also includes a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

(3) Also include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.

Download:- Flow-Chart.rar

Solution Preview :

Prepared by a verified Expert
Business Management: Evaluate the process flow chart using the lean concept
Reference No:- TGS03092357

Now Priced at $75 (50% Discount)

Recommended (95%)

Rated (4.7/5)